Stop GRC flow graph after defined time

Hallo,

I’m executing a flow graph in GRC and want to stop this flow graph
after some defined time, for example 3 seconds, or after a defined
amount of samples.

Currently I stop the flow graph by clicking on “Kill the flow graph”.
How can I implement, that the flow graph is stopped automatically?

Thorsten

You can use the Misc->Head block to limit the samples. Then set the flow
graph options to “run to completion”, this option is only available in
non-gui mode. See the options blocks.

-Josh