# How long do you take for each Development Cycle

**URL:** <https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824>\
**Category:** Rails\
**Created:** [January 28, 2009, 3:02pm UTC](https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824 "2009-01-28T15:02:02Z")\
**Posts on this page:** 9\
**Page:** 1

<div class="post-metadata">

**Author:** ![artchrst](https://www.ruby-forum.com/letter_avatar_proxy/v4/letter/a/e36b37/32.png) [@artchrst](https://www.ruby-forum.com/u/artchrst)\
**Post date:** [January 28, 2009, 3:02pm UTC](https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824/1 "2009-01-28T15:02:02Z")

</div>

Hi guys,

I don’t know if this question is proper to post here. But I think it is  
related to every developer, so I post.

I am using RoR for developments more than a year. We are using Bugzilla.  
We do unit, funcitonal and watir tests.

We usually schedule to do around 40-50 bugs for each development cycle  
and it scheduled to take 3-4 days.

Most of the tasks involve RoR MVC modification, documentation, testings,  
CSS style, debuggings, modify jQuery plugins.

And we maintain for IE6, ie7 and FF3.

However, most of the time we cannot meet schedule and bugs are often  
found (around 10-25% need to reopen).

I am quite frustrated about that although we tried our best and Overtime  
works, the result is not suitable.

How about yours? Is the cycle/time too short? or any tools (RoR,  
Bugzilla) do we used inproperly?

We are small company only 2 developers. And the freelance designer has  
left for a while. We do wanna change the situations, if you have similar  
situations or you know our problem, I do appreciate your comment and  
help!

Thanks, and Happy Year of the Ox !  
Arthur

---

<div class="post-metadata">

**Author:** ![artchrst](https://www.ruby-forum.com/letter_avatar_proxy/v4/letter/a/e36b37/32.png) [@artchrst](https://www.ruby-forum.com/u/artchrst)\
**Post date:** [January 28, 2009, 6:42pm UTC](https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824/2 "2009-01-28T18:42:53Z")

</div>

2 Developers \* 3-4 Days \* 40-50 Bugs \< Happiness…

Feel free to alter the first, second and/or third terms until the  
equation balances.

It sounds like you have the correct processes in place, you just need  
some scope management. With the idea that “less is more”, fewer bugs  
attempted should yield less rework, and less missed dates (and maybe get  
you home in time for dinner).

Prioritize the bugs that are on the list, and don’t be afraid to start  
tossing low priority bugs off the list if the scope of a higher priority  
change is larger than anticipated.

Overtime may work for short bursts, but fact is fact… tired  
programmers make mistakes.

---

<div class="post-metadata">

**Author:** ![artchrst](https://www.ruby-forum.com/letter_avatar_proxy/v4/letter/a/e36b37/32.png) [@artchrst](https://www.ruby-forum.com/u/artchrst)\
**Post date:** [January 29, 2009, 4:24pm UTC](https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824/3 "2009-01-29T16:24:34Z")

</div>

That’s the problem with bugs, you never know how long they will take  
to correct.

On the other hand, 4 days to resolve 25 simple bugs does not seem so  
tight.

Cheers, Sazima

---

<div class="post-metadata">

**Author:** ![artchrst](https://www.ruby-forum.com/letter_avatar_proxy/v4/letter/a/e36b37/32.png) [@artchrst](https://www.ruby-forum.com/u/artchrst)\
**Post date:** [January 30, 2009, 8:53pm UTC](https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824/4 "2009-01-30T20:53:38Z")

</div>

Arthur C. wrote:

> Hi guys,
> 
> I don’t know if this question is proper to post here. But I think it is  
> related to every developer, so I post.
> 
> I am using RoR for developments more than a year. We are using Bugzilla.  
> We do unit, funcitonal and watir tests.

Do you pair program? Use test-driven development? And do you make the  
fewest  
possible edits between successful test runs? Do you test incrementally,  
where  
only suites edited in the last 10 minutes run to integrate?

> We usually schedule to do around 40-50 bugs for each development cycle  
> and it scheduled to take 3-4 days.

By “bug” do you mean missing feature? glitch? or irritating surprise?

Honestly we have the last one about once a month. We could do better.  
But the  
good news about our missing features is we _know_ they are missing; they  
are not  
surprises…

> However, most of the time we cannot meet schedule and bugs are often  
> found (around 10-25% need to reopen).

Are your user stories very small, such as 1 hour to 3 days duration?

Do you integrate continously and deploy daily? Do you work overtime?

–  
Phlip

---

<div class="post-metadata">

**Author:** ![artchrst](https://www.ruby-forum.com/letter_avatar_proxy/v4/letter/a/e36b37/32.png) [@artchrst](https://www.ruby-forum.com/u/artchrst)\
**Post date:** [January 30, 2009, 9:03pm UTC](https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824/5 "2009-01-30T21:03:37Z")

</div>

> > I am using RoR for developments more than a year. We are using Bugzilla.  
> > We do unit, funcitonal and watir tests.
> 
> Do you pair program? Use test-driven development? And do you make the fewest  
> possible edits between successful test runs? Do you test incrementally, where  
> only suites edited in the last 10 minutes run to integrate?

Do you refactor _mercilessly_ enduring no un-DRY code?

---

<div class="post-metadata">

**Author:** ![artchrst](https://www.ruby-forum.com/letter_avatar_proxy/v4/letter/a/e36b37/32.png) [@artchrst](https://www.ruby-forum.com/u/artchrst)\
**Post date:** [January 31, 2009, 2:02pm UTC](https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824/6 "2009-01-31T14:02:56Z")

</div>

Hi Phlip,

Phlip wrote:

> Arthur C. wrote:
> 
> > Hi guys,
> > 
> > I don’t know if this question is proper to post here. But I think it is  
> > related to every developer, so I post.
> > 
> > I am using RoR for developments more than a year. We are using Bugzilla.  
> > We do unit, funcitonal and watir tests.
> 
> Do you pair program? Use test-driven development? And do you make the  
> fewest  
> possible edits between successful test runs? Do you test incrementally,  
> where  
> only suites edited in the last 10 minutes run to integrate?

We don’t use Test-driven development, but should be similar to Agile  
Development. We decide each phase by putting the tasks or previous bugs  
into bugzilla (ticket system), then start doing it. I think the problem  
may be somehow created in the design phase since we only use bugzilla  
but not e.g. UML.

For the automated tests, we just installed the ZenTest. Before that, we  
write the test before integration.

And not much Codes reviews too.

We lack those UML, and Code Reviews all b’cuz the time. I think there  
should be trade off for it.

> > We usually schedule to do around 40-50 bugs for each development cycle  
> > and it scheduled to take 3-4 days.
> 
> By “bug” do you mean missing feature? glitch? or irritating surprise?  
> Both. For our boss, some usability problem or layout problems are  
> surprise. And we focus on the functional stuff usually in our tests.  
> That’s the biggest surprises come from.

> Honestly we have the last one about once a month. We could do better.  
> But the  
> good news about our missing features is we _know_ they are missing; they  
> are not  
> surprises…  
> We sometimes know it, but our boss doesn’t think so. E.g. we modified  
> jQuery Validation (real time validation plugns) display, it works fine  
> in most case. But suddenly, in some ajax forms, the position distorted  
> in IEs. That considered a critical one.

So, how do you guys think about these kinda bug? Are we treating not  
serious enough to these problems?

> > However, most of the time we cannot meet schedule and bugs are often  
> > found (around 10-25% need to reopen).
> 
> Are your user stories very small, such as 1 hour to 3 days duration?
> 
> Do you integrate continously and deploy daily? Do you work overtime?

Our phase is susposed to be 3 days usually including the whole  
development cycles. But usually we used 4-5 days even with many OTs.

We integrate if we found that changes spread over web pages and before  
testing. Do you think our integrate process got problems?

Thanks guys!!!  
arthur

---

<div class="post-metadata">

**Author:** ![artchrst](https://www.ruby-forum.com/letter_avatar_proxy/v4/letter/a/e36b37/32.png) [@artchrst](https://www.ruby-forum.com/u/artchrst)\
**Post date:** [January 31, 2009, 2:05pm UTC](https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824/7 "2009-01-31T14:05:09Z")

</div>

Sazima wrote:

> That’s the problem with bugs, you never know how long they will take  
> to correct.
> 
> On the other hand, 4 days to resolve 25 simple bugs does not seem so  
> tight.
> 
> Cheers, Sazima

Yup, i agree. But the bosses and clients never think so. Or actually,  
they think so, but changed their mind when other things go wrong  
together as the whole process are delayed.

cheers, Arthur

---

<div class="post-metadata">

**Author:** ![artchrst](https://www.ruby-forum.com/letter_avatar_proxy/v4/letter/a/e36b37/32.png) [@artchrst](https://www.ruby-forum.com/u/artchrst)\
**Post date:** [January 31, 2009, 4:31pm UTC](https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824/8 "2009-01-31T16:31:24Z")

</div>

Arthur C. wrote:

> > On the other hand, 4 days to resolve 25 simple bugs does not seem so  
> > tight.
> > 
> > Cheers, Sazima
> 
> Yup, i agree. But the bosses and clients never think so. Or actually,  
> they think so, but changed their mind when other things go wrong  
> together as the whole process are delayed.

Ah, the joys of encountering reality! When a project starts, the process  
does  
not (apparently) matter! You can use code-and-fix, and whip out a great  
demo.

Then, as the clients start asking for feature requests, each one starts  
taking a  
liiiittle longer!

> > Do you pair program? Use test-driven development?

> We don’t use Test-driven development, but should be similar to Agile  
> Development. We decide each phase by putting the tasks or previous bugs  
> into bugzilla (ticket system), then start doing it. I think the problem  
> may be somehow created in the design phase since we only use bugzilla  
> but not e.g. UML.

TDD _is_ the design process. It also reduces bugs. Never write the tests  
“just  
before integration” because you will miss stuff.

Without TDD, you implement by debugging; by adding code, and noodling  
around  
with the running app to see if it works. That’s a complete waste of  
time. TDD  
tells you if the logic is working, faster, so you can free up more test  
time.

> For the automated tests, we just installed the ZenTest. Before that, we  
> write the test before integration.

ZenTest is just a tool.

> And not much Codes reviews too.

That is what pair programming is for. With just two guys, that will be a  
pain,  
though!

> We lack those UML, and Code Reviews all b’cuz the time. I think there  
> should be trade off for it.

UML is not a process. Just throw in RailRoad (with Graphviz) and the UML  
is  
automatic…

Now, is your code DRY? Is it all the same style? Are your models fat and  
controllers thin? Is any business logic in the view? Are your statements  
short?  
Does every name reveal intent? All these details will slow you down…

> Our phase is susposed to be 3 days usually including the whole  
> development cycles. But usually we used 4-5 days even with many OTs.

A “phase” is supposed to be a week. Stop doing overtime. But are your  
User  
Stories very small? Are they small increments on existing features, such  
as  
“take the form you wrote for the Frobs and now add a Delete button”.

When you do a User Story, are the programmers pulling for reducing the  
features?  
Do you do the minimum possible, get a review from your Onsite Customer,  
and then  
make him tell you to add more? _That_ is a review process - letting your  
boss  
watch things grow in realtime.

> We integrate if we found that changes spread over web pages and before  
> testing. Do you think our integrate process got problems?

By “integrate” do you mean “run all the tests and check in to Subversion  
if they  
all pass”? We do that every 1 to 10 minutes.

–  
Phlip  
["Pigleg too?", week 1](http://flea.sourceforge.net/PiglegToo_1.html)

---

<div class="post-metadata">

**Author:** ![artchrst](https://www.ruby-forum.com/letter_avatar_proxy/v4/letter/a/e36b37/32.png) [@artchrst](https://www.ruby-forum.com/u/artchrst)\
**Post date:** [January 31, 2009, 4:40pm UTC](https://www.ruby-forum.com/t/how-long-do-you-take-for-each-development-cycle/158824/9 "2009-01-31T16:40:48Z")

</div>

you missed the bug up your ass.